01Start with the approved plan
Before structural material is removed, the renovation team must have the required engineering and permits in place. We review the demolition limits and coordinate with the contractor or engineer so the crew follows the intended sequence.
02Controlled, not improvised
Load-bearing walls, roof sections and framing are removed methodically. Temporary support and installation of new structural members remain coordinated with the responsible contractor and engineering requirements.
03Clear conditions for installation
We expose connections carefully, remove the specified material and keep the opening organized. That gives the framing crew a clear work area and helps identify unforeseen site conditions before new work proceeds.